|
The company started in 1995 and successfully
supplied and installed over thousand
cost effective, attractive, steady,
comfortable and portable huts in India
and abroad. The company started supplying
5-10 shelters per month in the beginning
and has grown to a production capacity
of supplying more than 200 shelters
per month.
The company piloted by the flagship
parent organization - Modern Tiles
Group and over 60 years of trade,
Modern Prefab Systems Pvt, Ltd is
directly under professional and technical
management of highly experienced,
dedicated and quality team.
Areas of Application
The portable structures manufactured
by Modern Prefab Systems Pvt. Ltd.
covers various applications including
Barracks, Site Offices, Site Accommodations,
Class Rooms, Hangers, Storage Shed,
Labour Camps, Transit Camps, Guard
Houses, Sentry Posts, Roof Top Accommodation,
Hill Cottages, Partitions, Resorts
accommodation, Low Cost Housing and
Health Centres, etc. any many more.
Modern Prefab Systems Pvt. Ltd. also
manufactures custom made structures
for which necessary information regarding
requirement has to be intimated by
the client and the company works out
the best configuration which is idealy
suited to one's requirements and is
cost effective.
The company has already supplied
and erected several pre-fabricated
huts for leading government organizations
like Border Security Force (BSF),
Central Industrial Security Force
(CISF), Central Police Reserve Force
(CRPF), Indo-Tibet Border Police (ITBP),
Uttaranchal Police, Assam Rifles,
etc. where its work has been widely
appreciated too. It has also worked
with Public Works Department and (PWD)
and Central Public Works Department
(CPWD) in New Delhi and has executed
many works for them.
It has also been working with several
prestigious private institutions like
Shapoorji Paloonji, ETA Engg, Intercontinental
Construction, Nishant Builders, Afcons,
Floors India, Vijay Construction and
also has completed several large structures
for Larsen and Toubro at Bhutan.
Further, it has been working with
several multinationanls like Kajima-Daewoo
joint venture for whom it has made
labour accommodation at Dhauliganga
H.E. Project in UP Hills, Hyundai
Engg,. and Constructions Co. Ltd.
at their Yamuna Bridge Project, Naini
Allahabad for whom it has made site
offices, accommodations, warehouses,
workshops, etc. It has also worked
with IMCC-consortium of 5 MNCs who
are the chief contractors for Delhi
Metro Rail Project for whom it has
made site offices at Jamtar Mantar
and near Old Delhi Railway Station.
Quality
The organization is very sensitive
and stringent about quality of raw
materials and thus, it only buys its
materials from well established vendors
having international reputation with
ISO certifications. It has in place
stringent quality ensuring systems
of the raw materials
Performance
Since its inception, it has drawls
of over INR 170 million and has also
recently secured single largest order
in this industry for INR 186 million
for the supply of 933 numbers barracks/offices
to CRPF based on its past performance
and quality of material and services
provided to various Government and
private organizations.
Turnover:
| Year |
INR |
| 2000-01 : |
11.8 million |
| 2001-02: |
59.7 million |
| 2002-03: |
100.5 million |
| 2003-04: |
188.3 million |
Advantages :
-
Economical in construction, speedy
erection, environmentally friendly
-
Sandwich insulated panels provide
good soundproofing, and insulation
against hot and cold climates
-
Termites, water and fire retarding
structures, safe in earthquake
prone areas
-
Can be designed to withstand
55m/s wind speed, seismic zone
V and snow loads
-
Easily dismantled and reassembled
any number of times with minimum
breakage and has flexibility of
additions and modifications in
floor plans
-
Light structures provide for
easy transportation, handling
and can be installed in remote
areas and hilly terrains.
-
Structure once installed and
not dismantled regularly can match
the life of permanent construction
under normal climatic conditions.
-
The structure can also be erected
on steel base framework with floorboards
|